- home
- 80 KW solar plant – International, Al-Adala Road (Solaimaneyah 2)
Sameh Mabrouk
80 KW solar plant – International, Al-Adala Road (Solaimaneyah 2)
Assessing location and designing plant: November 18, 2019
Installation & operation: From December 9, 2019 to December 21, 2019
Visiting the plant after hurricane: March 17, 2020